Join
Proto save
£5.74
EVM50R0312MC Evolution Modular Blade by Kennametal
| Insert Shape | Prismatic Groove/Cutoff |
| Shank Height | 34.29mm |
| Adapter Type Machine Side | Modular Cartridge |
| Body Material | Steel |
| MFR Part No. | 5979200 |
| Head Height | 34.29mm |
| Cartridge Size | 50 |
| Coolant Supplied | No |
| Number of Inserts | 1 |
| Clamp Type | A2/A3/A4/Pg/Tg |
| Cutting Height | 20.72mm |
| Cutting Depth | 12mm |
| Insert Size | 3mm |
| Shank Width | 11.65mm |
| Hand Preference | Right |
| Blade Width | 2.45mm |
| Tool Length | 47.75mm |
| Unit Measured | Metric |
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

