Join
Proto save
£5.28
EVM65L0816MC Evolution Modular Blade by Kennametal
| Blade Width | 7mm |
| Number of Inserts | 1 |
| MFR Part No. | 6031040 |
| Insert Shape | Prismatic Groove/Cutoff |
| Cutting Height | 28.76mm |
| Adapter Type Machine Side | Modular Cartridge |
| Unit Measured | Metric |
| Body Material | Steel |
| Shank Width | 12.5mm |
| Cartridge Size | 65 |
| Coolant Supplied | Yes |
| Cutting Depth | 16mm |
| Shank Height | 41.46mm |
| Hand Preference | Left |
| Insert Size | 8mm |
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

