Join
Proto save
£5.74
EVM50L0422MC Evolution Modular Blade by Kennametal
| Body Material | Steel |
| Coolant Supplied | Yes |
| Shank Width | 11.65mm |
| Clamp Type | A2/A3/A4/Pg/Tg |
| Insert Shape | Prismatic Groove/Cutoff |
| Adapter Type Machine Side | Modular Cartridge |
| Cutting Depth | 22mm |
| Head Height | 34.29mm |
| Insert Size | 4mm |
| Number of Inserts | 1 |
| Tool Length | 57.75mm |
| Shank Height | 34.29mm |
| MFR Part No. | 5979188 |
| Blade Width | 3.45mm |
| Hand Preference | Left |
| Cartridge Size | 50 |
| Unit Measured | Metric |
| Cutting Height | 20.72mm |
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

