Join
Proto save
£5.28
EVM65L0626MC Evolution Modular Blade by Kennametal
| Shank Height | 42.06mm |
| Blade Width | 5.25mm |
| Body Material | Steel |
| Insert Shape | Prismatic Groove/Cutoff |
| Insert Size | 6mm |
| Cutting Height | 28.76mm |
| Shank Width | 12.5mm |
| Number of Inserts | 1 |
| Adapter Type Machine Side | Modular Cartridge |
| MFR Part No. | 5955421 |
| Hand Preference | Left |
| Coolant Supplied | Yes |
| Cartridge Size | 65 |
| Unit Measured | Metric |
| Cutting Depth | 26mm |
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

